The Schreiber Wind Project is proposed to be located on the north shore of Lake Superior, approximately 4 km south of the Town of Schreiber and 140 km north east of the City of Thunder Bay, Ontario. A meteorological assessment tower was installed in November 2010 to measure and record wind data. The configuration of the project has not yet been determined, but the land area available could host 6 – 8 wind turbines, or about 14 MW of generation capacity. A 115 kV transmission line is located 2 km from the site.